สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
The factory where your steel building is made

Our factory · Hai Son Industrial Park, Tay Ninh, Vietnam

The factory where your steel building is made

A 20,000 m² steel structure factory, owned and run by World Steel since 2016. Cutting, welding, shot blasting, painting and inspection under one roof: 2,500 T a month, certified to ISO 3834-2, EN 1090 EXC3 and IAS AC472, exporting to Thailand since 2018.

20,000 m²Factory area
2,500 TCapacity per month
3–4 weeksto fabricate a 100 T project
2016Factory opened
350+Engineers & craftsmen
7International certifications

Factory overview

One factory, one quality system, every Thai project

The World Steel factory stands in Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh province, 60 minutes by road from our head office in Ho Chi Minh City. Every steel frame, purlin and fire-protected member we deliver to Thailand is cut, welded, blasted, painted, inspected and packed here.

Because the plant is ours, we decide the fabrication slot, control the quality at every stage and confirm the shipping date. You deal directly with the company that makes your steel.

  • Fabrication to ISO 3834-2 and EN 1090 EXC3
  • Independent QA/QC department, reporting to quality management
  • Raw steel from Europe, Japan, Korea and Taiwan, traceable to mill certificates
  • Intumescent fire protection up to R120, applied in the factory
  • Packed in erection order for CIF or DDP delivery to Thailand
One factory, one quality system, every Thai project
Factory addressLot Q9-10-15-16, Street No.7, Hai Son Industrial Park, Duc Hoa, Tay Ninh Province, Vietnam Google Maps

Close to Ho Chi Minh City and the deep-sea port

Visitors from Thailand reach the factory the same day they land. Your steel leaves for Thailand from Cai Mep, Vietnam’s deep-sea gateway.

  • 60 minfrom our head office in Ho Chi Minh City
  • 80 minfrom Tan Son Nhat airport
  • ~100 kmby road to Cai Mep deep-sea port
  • 3–5 dayssailing to Laem Chabang
Journey map

Inside the factory

Four zones, from raw plate to packed container

Steel moves through the factory in one direction, and every stage is inspected by QC before the next one starts.

Full fabrication process
  1. Material receiving & storageMaterial receiving & storageMaterial receiving & storage 01

    Zone 1 / 4

    Material receiving & storage

    Plates and sections are checked against their mill certificates, identified by heat number and stored by grade before they are released to production.

    • Mill certificate check, EN 10204 3.1 on request
    • Heat-number traceability
    • QC stage 1: incoming material inspection
  2. Cutting, fit-up & weldingCutting, fit-up & weldingCutting, fit-up & welding 02

    Zone 2 / 4

    Cutting, fit-up & welding

    Plates are cut and drilled on CNC machines, then built-up beams and columns are fitted, welded on the automated and gantry welding lines and straightened.

    • CNC plasma, gas and laser cutting
    • CNC drilling and punching
    • Automated and gantry beam welding
    • Visual weld inspection and NDT (UT, MT)
  3. Shot blasting & paintingShot blasting & paintingShot blasting & painting 03

    Zone 3 / 4

    Shot blasting & painting

    Members are shot blasted to Sa 2½ and painted to the specified ISO 12944 system. Intumescent fire protection is applied here too, where film thickness can be controlled and recorded.

    • Shot blasting to Sa 2½
    • Paint systems to ISO 12944
    • Intumescent coating up to R120
    • Dry film thickness records
  4. Marking, packing & container loadingMarking, packing & container loadingMarking, packing & container loading 04

    Zone 4 / 4

    Marking, packing & container loading

    Every member is marked with its component code, bundled in erection order and loaded into containers for the port.

    • Component coding system
    • Packing lists by erection sequence
    • Container loading for Thailand

How it works

Watch a steel member go through the factory

An animated model of our production line. Each station ends at a QC gate: the member moves on only when it passes. Press a step to jump to it.

3.1 1 QC Material receiving 2 QC CNC cutting & drilling 3 QC Fit-up & assembly 4 QC Welding & NDT 5 QC Shot blasting 6 QC Painting & fire prote… 7 QC Coding & packing WORLD STEEL To Thailand → 8 ✓ Container to Thailand HOLD · NCR Repair → re-test B-12

Machinery

Production lines and main equipment

The technical equipment listed in our company profile, maintained by the factory’s own maintenance department.

  • CNC plasma & gas cutting

    Cuts plates and flanges to shape, straight from the CNC drawing files.

  • Bodor fibre-laser cutting

    Precise cutting of connection plates, stiffeners and small parts.

  • CNC drilling

    Drills bolt holes in plates and sections to drawing tolerance.

  • Punching machine

    Punches holes in plates and connection parts.

  • Hydraulic cutting & shearing

    Shears plates and flat bars to size.

  • Automated beam welding line

    Assembles and welds built-up H-beams and columns.

  • Gantry beam welding machines

    Long, continuous flange-to-web welds on heavy built-up members.

  • Beam straightening machine

    Corrects flange distortion after welding.

  • Shot blasting machine

    Cleans the steel surface before painting.

  • Paint & intumescent coating bays

    Primer, finish and fire-protection coatings applied indoors.

Certified raw materials

Raw steel comes from reliable mills in Europe, Japan, Korea and Taiwan, always with a certificate of origin, and conforms to ASTM and other standards such as EN, JIS and AS/NZS.

On request, depending on the project: EN 10204 Type 3.1 test certificates, CE marking, JIS mark, BSI Benchmark and Factory Production Control (FPC) certification.

ASTM A572/A572M
Grade 42, 50, 55, 60
EN 10025
S235, S275, S355
JIS G 3106
SM400, SM490, SM490Y
AS/NZS 1594
HA300, HA350
Inspected at every stage before it moves on HOLDtag + NCR

Quality

Inspected at every stage before it moves on

Our QA/QC department inspects every stage of fabrication. If a defect appears, QC tags the item “Hold” and opens a non-conformance report (NCR); it moves on only when it passes.

  1. 01Incoming material inspection
  2. 02Cutting and drilling inspection
  3. 03Fit-up and assembly inspection
  4. 04Welding inspection and NDT
  5. 05Surface cleaning (blasting) inspection
  6. 06Painting inspection
  7. 07Component coding and final release

Our quality control process All certificates

  • IAS AC472IAS AC472
  • EN 1090 EXC3 · CEEN 1090 EXC3 · CE
  • ISO 3834-2ISO 3834-2
  • AS/NZS 5131 CC3AS/NZS 5131 CC3
  • ISO 9001ISO 9001
  • ISO 14001ISO 14001
  • ISO 45001ISO 45001

People & organisation

The team behind your steel

350+ engineers and craftsmen. The factory runs its own planning, production, QA/QC, warehouse, maintenance and HSE departments, all reporting to one management team.

  • Production planning

    Books your fabrication slot, schedules every order and reports progress every week.

  • Production teams

    Cutting, fitting, welding, blasting and painting crews on the shop floor.

  • QA/QC department

    Inspectors who report to quality management, not to production.

  • Warehouse

    Receives, identifies and stores raw material and issues it to production.

  • Maintenance

    Keeps the machinery and overhead cranes running.

  • HSE

    Health, safety and environment on the shop floor, under ISO 45001 and ISO 14001.

Lead times

From approved drawings to your Thai site

  1. 1–3 weeksApproval drawingsGA, anchor bolts and reactions for your Thai engineer and permit
  2. 3–6 weeksFabrication & QAA 100 T project is fabricated in 3–4 weeks
  3. 3–5 daysSea freightSouthern Vietnam to Laem Chabang, Bangkok, Map Ta Phut or Songkhla
  4. 3–7 daysCustoms & truckingWith DDP we clear Thai customs and deliver to your site

Video

See the factory on video

Take a tour of the World Steel plant: cutting, welding, blasting, painting and quality control. Want to see your own order on the shop floor? Book a live video tour with our team, without leaving Thailand.

Audit Online Book a live video tour

FAQ

Questions Thai clients ask us

Where exactly is the World Steel factory?

In Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh province, Vietnam: about 60 minutes by car from our head office in Ho Chi Minh City and 80 minutes from Tan Son Nhat airport.

How much steel can the factory produce?

2,500 T of structural steel per month from a 20,000 m² plant. A 100 T project is fabricated in 3–4 weeks.

Which standards does the factory work to?

Fabrication is certified to ISO 3834-2, EN 1090 EXC3 (CE marking), AS/NZS 5131 CC3 and IAS AC472, under ISO 9001, ISO 14001 and ISO 45001 management systems.

Can we inspect our own order during fabrication?

Yes. You or your third-party inspector are welcome at any stage, in person or by live video. We share the inspection and test plan before fabrication starts.

Is fire protection applied in the factory?

Yes. Intumescent fire protection up to R120 is applied in our paint bays, where film thickness is measured and recorded for every member.

See the factory for yourself

Visit us in Tay Ninh or book a live video tour. We plan the day, the route through the factory and the meeting with our engineers.

LINEWhatsAppGet a quotation