สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Bridges made in the factory, lifted in a night

Project types · Steel & pedestrian bridges

Bridges made in the factory, lifted in a night

Pedestrian overpasses, footbridges between buildings, conveyor and pipe bridges and short-span steel bridges. Designed and fabricated in our own factory, trial-assembled, and shipped in the largest sections the route allows, so road closures stay short.

2018delivering steel structures to Thailand
196 TCFG Long An steel bridge, Vietnam (2023)
EXC3EN 1090 execution class for welded steel
2,500 Tfabrication capacity every month

Less time over live traffic

The best bridge work happens in the factory

Steel & pedestrian bridges

A footbridge over a busy Thai road, a link between two factory buildings or a pipe bridge across a plant road all share one problem: every hour of work on site disrupts traffic or operations. The answer is to do almost everything in the factory.

We design the bridge, fabricate full-length or large segments with welded splices in our certified factory, trial-assemble where needed, coat it for the site and ship it ready to lift. On site, your contractor sets the sections on prepared supports, often in a single night closure. We have delivered steel bridges and footbridges for Singapore and Vietnam; non-Thai projects are shown as references.

  • Pedestrian overpasses and footbridges
  • Links between buildings and over plant roads
  • Conveyor and pipe bridges
  • Large pre-assembled sections, short closures

Structural solutions

Bridges we design and fabricate

Each option is engineered member by member in our design office, then built on our own fabrication lines.

Pedestrian overpasses

Road-crossing footbridges with stairs, ramps or lift towers and roof cover.

Building link bridges

Enclosed or open links between factory, office and hospital buildings.

Short-span steel bridges

Truss, plate-girder and box-girder bridges for estates, campuses and private roads.

Conveyor bridges

Galleries carrying conveyors between silos, mills and loading points.

Pipe and cable bridges

Pipe racks and cable bridges across plant roads.

Stairs, ramps and towers

Access stairs, accessible ramps and lift shafts for bridges.

Your challenges, our answers

What owners ask us, and how we solve it

The questions we hear most often from Thai owners, designers and contractors.

Challenge 01

Road closures must be short

Our answer

Bridges arrive in large pre-assembled sections and are lifted in planned night closures.

Challenge 02

Transport limits

Our answer

Section lengths and splice positions planned around the route from port to site.

Challenge 03

Weld quality on primary members

Our answer

Welding to ISO 3834-2 and EN 1090 EXC3 with full inspection records.

Challenge 04

Corrosion over traffic

Our answer

ISO 12944 systems for long life with little maintenance over live roads.

Challenge 05

Footfall vibration

Our answer

Deck stiffness and natural frequency checked so the bridge feels solid.

Challenge 06

Approvals

Our answer

Drawings and calculations prepared for your Thai engineer and the road authority.

Inside the structure

Typical design ranges for steel bridges

Every project is engineered to its own brief and site. These are the ranges we work in most often.

Design itemTypical range we engineer
SpanAbout 10–50 m single span, longer with intermediate supports
TypeTruss, plate girder, box girder or Vierendeel
DeckSteel plate, grating, composite slab or precast
WidthPedestrian 2–5 m, vehicle bridges to project needs
CoverOpen, roofed or fully enclosed
CorrosionISO 12944 system for the site, galvanising for secondary steel
DeliveryFull-length or large segments sized for the route

Design highlights

  1. 01

    Trial assembly

    Critical splices fitted in the factory before shipping.

  2. 02

    Lifting plan support

    Weights, lifting points and centre of gravity provided.

  3. 03

    Full QC records

    Weld, NDT and coating records for each segment.

  4. 04

    One supplier

    Bridge, stairs, ramps and roof from one factory.

Designed and made by World Steel

From our design office to your Thai port, in one company

Your structure is not bought from a trader or subcontracted: it is engineered by our team and fabricated, inspected, painted and packed in the World Steel factory.

World Steel factory · Tay Ninh, Vietnam20,000 m² · 2,500 T/monthISO 9001 · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3 · IAS AC472
  1. Designed by our own engineers01

    Designed by our own engineers

    World Steel structural engineers calculate to Thai and international codes and produce the Tekla 3D model, approval drawings and every shop drawing. Nothing is outsourced.

  2. CNC cutting and drilling02

    CNC cutting and drilling

    Plates and sections cut by plasma, laser and CNC drilling lines straight from the model, with first-piece inspection before the batch runs.

  3. Built-up members welded in-house03

    Built-up members welded in-house

    Submerged-arc welding lines and qualified welders make columns and rafters to ISO 3834-2 and EN 1090 EXC3.

  4. Inspected before it leaves04

    Inspected before it leaves

    Dimensional checks, UT and MT weld testing and paint thickness readings, recorded piece by piece in the QC dossier you receive.

  5. Blasted and painted in the factory05

    Blasted and painted in the factory

    Shot blasting and an ISO 12944 paint system chosen for inland, coastal or port sites, or intumescent fire protection up to R120.

  6. Packed by erection zone, shipped CIF06

    Packed by erection zone, shipped CIF

    Every piece marked, bundled by erection zone and loaded so the first members your erector needs reach site first.

Scope of supply

What you receive, and what stays local

A clear split of work keeps your budget and schedule predictable.

World Steel designs, makes and ships

  • Structural design and calculations to Thai and international codes
  • Approval drawings for your Thai engineer (กว.) to review and sign
  • Main steel frame, C/Z purlins, bracing and all connection bolts
  • Shop painting or fire-protection paint, packing and CIF shipping
  • QC dossier, erection drawings and remote technical support

Your Thai team on site

  • Site survey, soil investigation and foundations
  • Building permit with the local authority or IEAT
  • Unloading at site and erection by your contractor or our partners
  • Roof and wall sheeting, doors and MEP (or sourced in Thailand)

Thai codes and standards

Designed to pass Thai permitting

Building Control Act B.E. 2522

Construction permit from the local authority, or IEAT inside an industrial estate; we prepare the structural drawings and calculations.

DPT 1311-50 · DPT 1301/1302-61

Thai wind and seismic standards applied for the province of your site.

Engineering Profession Act B.E. 2542

Your licensed Thai engineer reviews and signs; we answer every comment.

Road authority approval

Bridges over public roads need approval from the road owner (e.g. Department of Highways or the local authority); your Thai engineer leads the submission.

Work we have delivered

Bridge references

Steel bridges and footbridges we designed, fabricated and delivered. These are outside Thailand and are shown as references.

All Thai projects

Projects outside Thailand are shown as references with the same type of structure.

Why World Steel

One partner from first sketch to Thai port

01

Exporting to Thailand since 2018

Steel buildings for manufacturers, developers and retailers across Thailand.

02

Our own certified factory

20,000 m² in Tay Ninh, 2,500 T a month, ISO 3834-2 and EN 1090 EXC3 welding quality.

03

Engineers, not traders

The team that designs your structure is the team that answers your Thai engineer and supervises fabrication.

04

CIF or DDP to your site

Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.

FAQ

Questions Thai clients ask us

Have you built bridges in Thailand?

Our bridge references so far are in Singapore and Vietnam. We design to the same standards for Thailand and work with your Thai engineer and contractor for approvals and erection.

Do you install the bridge?

We design, fabricate and deliver. Lifting and installation are done by your Thai contractor; we provide weights, lifting points and technical support.

How long can one section be?

It depends on the transport route. We plan section lengths and splices with you before fabrication.

Can the bridge have a roof and lift?

Yes. Roof cover, enclosures, stairs, ramps and lift towers can be part of the same package.

Which design codes do you use?

The code agreed for the project with your engineer, commonly AISC/ASCE or Eurocode, checked against Thai requirements.

Planning a footbridge or link bridge?

Send the span, width, location and any access needs. We reply within one working day with a concept and budget.

WhatsAppGet a quotation