Monsoon season
From about May to October, plan erection windows and covered storage; we can sequence deliveries to suit.

Project delivery process
Twelve clear steps, one project engineer and a schedule you can plan around. This is how every World Steel project for Thailand runs – from design to delivery.
Day 1–2
Send drawings, a sketch or just the size, location and use. We confirm wind zone, soil and crane needs, delivery term and target dates – in English or Thai, on LINE, WhatsApp or e-mail.
Enquiry checklistSite location review
Within 48 h
Our engineers size the frame, purlins, bracing and fire protection, then price steel, paint, packing and freight. You receive one clear offer, CIF or DDP.
QuotationPreliminary layoutSteel weight estimate
Week 1–3
After order we issue general arrangement, anchor-bolt plan, base reactions and structural calculations to Thai loading (DPT 1311 wind, 1301/1302 seismic) or your code.
GA drawingsAnchor-bolt planCalculation report
Week 2–4
Your Thai licensed engineer (Council of Engineers) reviews and signs for the building permit or the estate approval. We answer questions and revise quickly.
Signed drawings (by client’s engineer)Revision log
Week 2–4
The approved design is modelled in Tekla; every plate and bolt is detailed. Steel is drawn from stock or ordered from certified mills.
Tekla modelShop drawingsMill certificates
Week 3–8
CNC cutting and drilling, automated beam welding and assembly in our 20,000 m² factory – with a fabrication slot booked when you order.
Production scheduleWeekly progress photos
Throughout
Incoming material, cutting/drilling, fit-up, welding (VT/UT), blasting and painting each inspected against the ITP. Non-conformities are tagged Hold and closed by NCR.
ITPInspection recordsWeld NDT reports
Week 5–8
Sa 2.5 blasting, paint system to ISO 12944 with TOA or your specified brand, intumescent coating where fire rating is required; film thickness recorded.
DFT recordsPaint data sheets
Week 7–9
Members piece-marked and bundled by erection sequence; containers and flat-racks loaded to a packing list you receive in advance.
Packing listLoading photosErection drawings
3–5 days at sea
From southern Vietnam to Laem Chabang, Bangkok, Map Ta Phut or Songkhla. We send B/L, invoice, insurance and ATIGA Form D for 0 % ASEAN import duty.
Bill of ladingInsuranceForm D
3–7 days
With DDP we clear Thai customs, pay duties and VAT, and truck the steel to your site in the order your erection team needs it.
Customs entryDelivery schedule
On site
Anchor-bolt templates, erection drawings and supervision on request; touch-up paint, as-built drawings and the full quality dossier at handover.
As-built drawingsQuality dossierTouch-up kit
Responsibilities
| Task | World Steel | Client |
|---|---|---|
| Structural design & calculations | ✓ | Review |
| Thai engineer sign-off & building permit | Support | ✓ |
| Foundations & anchor-bolt setting | Anchor-bolt plan & templates | ✓ |
| Fabrication, QC & painting | ✓ | Optional witness inspection |
| Sea freight to a Thai port | ✓ (CIF / DDP) | – |
| Thai customs, duties & trucking | ✓ (DDP) | ✓ (CIF) |
| Erection | Drawings & supervision on request | ✓ (own or partner contractor) |
| Roofing & cladding | – | ✓ (local supplier) |
Documents
Thailand
From about May to October, plan erection windows and covered storage; we can sequence deliveries to suit.
Songkran (April) and New Year close ports and customs for several days – we build them into the schedule.
Many Thai owners hold a ceremony for raising the first column (Sao Ek). Tell us the date and we deliver the first columns ahead of it.
Allow time for the estate or local authority review; our quick drawing revisions keep it short.
Structural design, fabrication, fire protection and CIF or DDP delivery in one quotation. Answer within 48 hours.