Hygiene audits (GMP, HACCP, BRCGS)
Members and connections are detailed to avoid horizontal ledges above product zones; closed or sloped sections are used where dust could settle, and purlins sit above a sealed ceiling.

Industries · Food & beverage
Food processing plants, beverage lines and cold stores built around hygiene, temperature and audit day. Frames detailed for wash-down, coated for humid and chemical-cleaned rooms, and shipped CIF to the Thai port nearest your plant.
The Thai food industry

Thailand is one of the world's leading food exporters: seafood, poultry, rice, sugar, fruit, ready meals and drinks leave Thai plants for markets with strict buyers. Clusters around Samut Sakhon, Nakhon Pathom, Chonburi, Saraburi and the North-East process local crops close to the farm.
For a food plant the building is part of food safety. Customers audit it, the Thai FDA licenses it and the product depends on it. Steel lets you build large, column-free production halls quickly, but only if the frame is detailed so dust, water and pests have nowhere to settle, and the coating survives daily cleaning.
Your challenges, our answers
The issues that matter most when the building houses food.
Members and connections are detailed to avoid horizontal ledges above product zones; closed or sloped sections are used where dust could settle, and purlins sit above a sealed ceiling.
Blast cleaning to Sa 2.5 and an ISO 12944 coating system chosen for wet, high-humidity rooms; hot-dip galvanising where the client specifies it.
The frame stays outside the insulated panel envelope or is thermally broken, which prevents condensation, ice and corrosion on the steel.
Roof and ceiling steel designed for refrigeration, ducts, pipe racks and maintenance walkways, so services hang where the process needs them.
Frames and end walls designed for future bays, and erection sequences that keep the existing plant running.
Fabrication slots reserved at order, shipped by erection zone, so the plant is ready before the harvest or the export contract starts.
What we build for food & beverage
Production halls for meat, seafood, ready meals, bakery and snacks, with hygienic zoning and service floors.
Long-span halls for filling and packing lines, syrup rooms, and high-bay finished-goods stores.
Chilled and frozen warehouses with insulated panels, anteroom docks and plant rooms.
Receiving halls and bulk stores for rice, sugar, cassava and fruit, built for dust and heavy loads.
Dry stores, packaging material warehouses and dispatch buildings next to production.
Boiler houses, refrigeration plant rooms, wastewater and utility buildings, plus pipe and cable racks.
Inside the structure
Typical design choices for food and beverage buildings. Every project is engineered to its own process, site and audit standard.
| Design item | Typical approach |
|---|---|
| Production hall | Column-free spans for flexible line layouts, or columns on a grid agreed with your process engineer |
| Ceiling and services | Walkable or suspended ceiling with loads for ducts, refrigeration and pipe racks |
| Cold store framing | Frame outside the insulated envelope, or thermally broken supports |
| Surface preparation | Shot blasting to Sa 2.5 before painting |
| Coating system | ISO 12944 system for the corrosivity of each room: dry stores, wet production, coastal sites |
| Hygienic detailing | No dust ledges above product; sealed or sloped surfaces where needed |
| Fire protection | Intumescent paint where the authority or insurer requires a fire rating |
| Future expansion | End walls and frames ready for extra bays |
We discuss raw, high-care and dispatch zones with you first, so structure and coatings match each zone.
Roof build-ups, ventilation and cold-store junctions designed so water does not drip onto the line.
Platforms, mezzanines, equipment supports and pipe racks fabricated with the main building.
Mill certificates, paint reports and inspection records, ready for your customer or auditor.
Thai codes and food standards
Construction permit from the local authority, or from IEAT inside an industrial estate.
Factory licence (ร.ง.4); we provide building data, areas and layouts for your application.
Hygienic requirements for production premises; our detailing supports what inspectors look for in the building.
Your buyer audits the building as part of food safety; we document materials and coatings.
Thai wind and seismic standards, checked for the province of your plant.
Corrosion protection of steel by paint systems, selected room by room.
Proven projects
Our Thai food project first, followed by food, beverage and cold-storage references from our international portfolio.

Factory
6
Factory
12
Factory
9
Factory
3
Warehouse
2
Warehouse
Projects outside Thailand are shown as references with the same type of structure.
Where food is made
Estates tagged for food and agro-processing in our directory of Thai industrial estates.
Why World Steel
Factories, warehouses and food buildings delivered across Thailand, including Based Meat Factory.
2,500 T of fabrication capacity a month, ISO 9001 quality and ISO 3834-2 welding, inspected before shipment.
Approval drawings your Thai engineer can sign, with wind and seismic loads for your province.
Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.
Explore by keyword
FAQ
Yes. Most new food plants in the region are steel-framed. The key is hygienic detailing and the right coating system for each room, which we agree with you at design stage.
We blast to Sa 2.5 and choose an ISO 12944 system for the corrosivity of the room, typically a zinc-rich primer with epoxy and polyurethane layers, from brands such as TOA or Jotun. Hot-dip galvanising is available on request.
Yes. We keep the frame outside the insulated envelope or use thermally broken supports, so the steel stays dry and the panels can be sealed continuously.
We provide material certificates, paint data and inspection records for the steel. The process layout and GMP plan stay with your food-safety team; we design the structure around them.
Yes. We design the new bays to connect to your existing frame and plan an erection sequence with your contractor that keeps production running.
Other industries
Send your site, process layout and hygiene zones. We reply within one working day with a structural concept and budget.