สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Double your floor area without a new building

Project types · Mezzanines & equipment platforms

Double your floor area without a new building

Office and storage mezzanines, e-commerce picking levels, plant and equipment platforms inside existing warehouses and factories. Designed for your loads, fabricated in our own factory and shipped as bolt-together kits.

2018delivering steel structures to Thailand
Boltedkits that install with little downtime
EXC3EN 1090 execution class for welded steel
2,500 Tfabrication capacity every month

Using the height you already have

The cheapest square metre is the one above your head

Mezzanines & equipment platforms

Many Thai warehouses and factories have 8–12 m of clear height but use only the floor. A steel mezzanine turns that air into offices, storage, picking floors or a platform for machines, at a fraction of the cost and time of a new building, and without a new building permit in many cases (your Thai engineer confirms).

We design each mezzanine for its real loads, from office use to pallet racking and heavy equipment, check the existing slab and columns with your engineer, and fabricate a bolted kit with stairs, handrails and pallet gates in our factory. Installation is planned around your operations, often in zones over weekends.

  • Offices, storage, picking and equipment platforms
  • Free-standing or tied into the existing frame
  • Stairs, handrails, pallet gates and decking included
  • Bolted kits installed zone by zone

Structural solutions

What we build above the floor

Each option is engineered member by member in our design office, then built on our own fabrication lines.

Storage mezzanines

Floors for shelving, cartons or light pallets, with pallet gates and loading points.

E-commerce picking levels

Multi-tier picking floors with conveyor openings and chutes.

Office mezzanines

Offices, meeting rooms and QC labs above production or storage.

Equipment and plant platforms

Platforms for chillers, compressors, tanks and process machines, with access stairs.

Maintenance walkways

Catwalks, crossovers and access ladders along lines and conveyors.

Fire-rated mezzanines

Intumescent protection where escape routes or Thai rules require fire-rated floors.

Your challenges, our answers

What owners ask us, and how we solve it

The questions we hear most often from Thai owners, designers and contractors.

Challenge 01

Will the existing slab carry it?

Our answer

We provide column loads early so your engineer can check the slab; base plates are sized to spread the load.

Challenge 02

No shutdown allowed

Our answer

Bolted kits are installed in zones, often outside working hours.

Challenge 03

Columns in the way of racking

Our answer

Column grid set around your racking, aisles and forklift routes.

Challenge 04

Floor vibration

Our answer

Beams sized for stiffness so office floors and picking levels feel solid.

Challenge 05

Safety on upper floors

Our answer

Handrails, toe boards, pallet gates and stairs are part of the kit.

Challenge 06

Changing needs later

Our answer

Bolted design lets a mezzanine be extended or relocated.

Inside the structure

Typical design ranges for mezzanines and platforms

Every project is engineered to its own brief and site. These are the ranges we work in most often.

Design itemTypical range we engineer
Floor loadOffice, storage or equipment loads as specified
Column gridAbout 4–8 m, set around racking and aisles
DeckSteel deck with board, composite deck or grating
HeightSingle or multi-tier within the existing building
AccessStairs, ladders, pallet gates and goods lifts
Fire protectionIntumescent paint where fire-rated floors are required
ConnectionFree-standing or tied to the existing frame after checks

Design highlights

  1. 01

    Kit delivery

    Every beam, column, stair and rail in one marked kit.

  2. 02

    Minimal downtime

    Installed zone by zone around operations.

  3. 03

    Slab-friendly

    Column loads and base plates agreed with your engineer.

  4. 04

    Ready to grow

    Bolted connections allow extension later.

Designed and made by World Steel

From our design office to your Thai port, in one company

Your structure is not bought from a trader or subcontracted: it is engineered by our team and fabricated, inspected, painted and packed in the World Steel factory.

World Steel factory · Tay Ninh, Vietnam20,000 m² · 2,500 T/monthISO 9001 · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3 · IAS AC472
  1. Designed by our own engineers01

    Designed by our own engineers

    World Steel structural engineers calculate to Thai and international codes and produce the Tekla 3D model, approval drawings and every shop drawing. Nothing is outsourced.

  2. CNC cutting and drilling02

    CNC cutting and drilling

    Plates and sections cut by plasma, laser and CNC drilling lines straight from the model, with first-piece inspection before the batch runs.

  3. Built-up members welded in-house03

    Built-up members welded in-house

    Submerged-arc welding lines and qualified welders make columns and rafters to ISO 3834-2 and EN 1090 EXC3.

  4. Inspected before it leaves04

    Inspected before it leaves

    Dimensional checks, UT and MT weld testing and paint thickness readings, recorded piece by piece in the QC dossier you receive.

  5. Blasted and painted in the factory05

    Blasted and painted in the factory

    Shot blasting and an ISO 12944 paint system chosen for inland, coastal or port sites, or intumescent fire protection up to R120.

  6. Packed by erection zone, shipped CIF06

    Packed by erection zone, shipped CIF

    Every piece marked, bundled by erection zone and loaded so the first members your erector needs reach site first.

Scope of supply

What you receive, and what stays local

A clear split of work keeps your budget and schedule predictable.

World Steel designs, makes and ships

  • Structural design and calculations to Thai and international codes
  • Approval drawings for your Thai engineer (กว.) to review and sign
  • Main steel frame, C/Z purlins, bracing and all connection bolts
  • Shop painting or fire-protection paint, packing and CIF shipping
  • QC dossier, erection drawings and remote technical support

Your Thai team on site

  • Site survey, soil investigation and foundations
  • Building permit with the local authority or IEAT
  • Unloading at site and erection by your contractor or our partners
  • Roof and wall sheeting, doors and MEP (or sourced in Thailand)

Thai codes and standards

Designed to pass Thai permitting

Building Control Act B.E. 2522

Construction permit from the local authority, or IEAT inside an industrial estate; we prepare the structural drawings and calculations.

DPT 1311-50 · DPT 1301/1302-61

Thai wind and seismic standards applied for the province of your site.

Engineering Profession Act B.E. 2542

Your licensed Thai engineer reviews and signs; we answer every comment.

Building Control Act (alterations)

Your Thai engineer confirms whether the mezzanine needs a permit for alterations to the existing building.

Why World Steel

One partner from first sketch to Thai port

01

Exporting to Thailand since 2018

Steel buildings for manufacturers, developers and retailers across Thailand.

02

Our own certified factory

20,000 m² in Tay Ninh, 2,500 T a month, ISO 3834-2 and EN 1090 EXC3 welding quality.

03

Engineers, not traders

The team that designs your structure is the team that answers your Thai engineer and supervises fabrication.

04

CIF or DDP to your site

Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.

FAQ

Questions Thai clients ask us

Do I need a building permit for a mezzanine?

It depends on the size and use and on the local authority. Your Thai engineer confirms; we provide drawings and calculations if a permit is needed.

Can the existing slab carry the mezzanine?

We give you column loads early so your engineer can check the slab. Larger base plates or local footings can be added if needed.

How long does installation take?

A typical mezzanine kit is installed in days to a few weeks, zone by zone, so operations can continue.

Can a mezzanine carry pallet racking?

Yes, if designed for it. Tell us the rack and pallet loads and we size the floor and columns accordingly.

Can it be moved or extended later?

Yes. Bolted connections allow a mezzanine to be extended, reconfigured or relocated.

Need more floor space inside your building?

Send the building size, clear height and intended use. We reply within one working day with a mezzanine concept and budget.

WhatsAppGet a quotation