Full-width door openings
Door-head trusses or girders designed for the door system, with deflection limits agreed with the door supplier.

Industries · Aviation
Aircraft hangars, MRO workshops, cargo terminals and airside support buildings with long clear spans and large door openings. Our first Thai project in 2018 was an aircraft hangar, and we bring the same team to yours.
Thai aviation

Thailand is one of Asia's major aviation markets, with international gateways in Bangkok, Phuket and Chiang Mai, regional airports across the provinces and a growing maintenance, repair and overhaul (MRO) cluster, including the U-Tapao area in the EEC. Air cargo for e-commerce and perishables is growing too.
A hangar is one of the most demanding steel buildings: a door opening the full width of the aircraft, a roof spanning without columns and doors, cranes and services hanging from the structure. Steel is the only practical material for these spans, and design quality decides how the doors run for decades.
Your challenges, our answers
Door-head trusses or girders designed for the door system, with deflection limits agreed with the door supplier.
Built-up or truss frames optimised for weight and transport, spliced for container shipping.
Erection sequences and delivery planned around airport security and working windows.
Coating systems for coastal corrosivity at Phuket, Samui, U-Tapao or other seaside airports.
Roof steel designed for overhead cranes, hoists and docking platforms.
Intumescent protection where a fire rating is required for hangars or stores.
What we build
Narrow- and wide-body hangars, flying-school and general-aviation hangars.
Engine, component and paint shops with crane bays and stores.
Cargo sheds and forwarder warehouses with docks on landside and airside.
Temperature-controlled buildings for fresh produce and pharmaceuticals.
Fire stations, ground-equipment workshops and offices.
Multi-storey car parks, terminal canopies and walkways.
Inside the structure
Typical design choices. Every project is engineered to its own brief, site and standards.
| Design item | Typical approach |
|---|---|
| Clear span | Sized by aircraft wingspan plus clearance, with built-up or truss frames |
| Door head | Truss or girder for the full door opening, with deflection agreed with the door supplier |
| Height | Tail height plus clearance for docking and cranes |
| Cranes | Overhead cranes or hoists for engines and components |
| Wind | DPT 1311-50 zone; typhoon factor where applicable in the South |
| Coating | ISO 12944 system for coastal airports |
| Transport | Members spliced to fit containers and erected with bolted joints |
Door loads and deflection limits fixed early, so doors run smoothly for decades.
Optimised members reduce tonnage and foundation loads.
Bolted connections and sequenced deliveries for restricted sites.
Our 200 T hangar in 2018 was our first Thai project.
Thai codes and standards
Construction permit from the local authority, or from IEAT inside an industrial estate. We prepare drawings and calculations for the submission.
Thai wind and seismic standards, checked for the province of your site.
Your licensed Thai engineer (กว.) reviews and signs; we answer every comment.
Airside works follow the Civil Aviation Authority of Thailand and airport operator requirements; we supply data for your submissions.
Design of long-span members and loads, checked against Thai standards.
Proven projects
Thai projects first, followed by references from our international portfolio with the same type of structure.
Why World Steel
Factories, warehouses and commercial buildings delivered across Thailand.
2,500 T of fabrication capacity a month, ISO 9001 quality and ISO 3834-2 welding, inspected before shipment.
Approval drawings your Thai engineer can sign, with wind and seismic loads for your province.
Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.
Explore by keyword
FAQ
Spans are set by the aircraft you need to house. We use built-up portal frames for moderate spans and trusses for wide-body hangars, optimised for weight and shipping.
Yes. An aircraft hangar of about 200 T, delivered in 2018, was our first project in Thailand.
We design the structure for the door system and coordinate with the door supplier you choose; the door itself is supplied by a specialist.
Yes. We plan deliveries and erection sequences with your contractor around airport access and working windows.
Other industries
Send your site, size and requirements. We reply within one working day with a structural concept and budget.