สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
20,000 m² of fabrication, 2,500 T a month

Factory · Hai Son Industrial Park, Tay Ninh

20,000 m² of fabrication, 2,500 T a month

Our fabrication plant in Hai Son Industrial Park, Duc Hoa, opened in 2016: CNC cutting, automated beam welding, shot blasting, painting and final inspection under one roof. Every steel building we deliver to Thailand is made here.

20,000 m²Factory floor
2,500 TCapacity per month
2016Factory opened
60 minFrom the head office
2018Exporting to Thailand since

What happens here

From raw plate to a packed container

Plates and sections are checked against their mill certificates, cut, welded, blasted and painted, then inspected and packed in erection order for CIF or DDP delivery to Thailand. Fabrication follows ISO 3834-2 and EN 1090 EXC3.

  • CNC cutting and drilling
  • Automated built-up beam welding
  • Shot blasting to Sa 2½ and paint systems to ISO 12944
  • Intumescent fire protection up to R120, applied in the factory
  • Weld, coating and dimensional inspection
  • Packing and container loading in erection order

Factory

Inside the factory

Factory entrance and office building Factory entrance and office building
Automated beam welding Automated beam welding
Fitting and assembly bay Fitting and assembly bay
Painted members ready for inspection Painted members ready for inspection
Fire-protection coated steel Fire-protection coated steel
Loading containers for Thailand Loading containers for Thailand
What is it about?
We use your details only to answer this request. Privacy

FAQ

Questions Thai clients ask us

Can we inspect our own order during fabrication?

Yes. Clients and third-party inspectors are welcome at the factory at any stage. We share the inspection and test plan before fabrication starts.

How far is the factory from Ho Chi Minh City?

About 60 minutes by car from our head office and 80 minutes from Tan Son Nhat airport.

How much can the factory produce?

2,500 T of structural steel per month, from a 20,000 m² plant.

WhatsAppGet a quotation