สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Warehouses and distribution centres built around your racking

Customers · Logistics, 3PL & e-commerce operators

Warehouses and distribution centres built around your racking

Clear-span distribution centres, fulfilment centres and cross-docks with the eave height, dock layout and floor area your operation needs. Designed by our engineers, made in our own factory and delivered on a date your customers can count on.

2018exporting steel structures to Thailand
30–60 mtypical clear spans
3Dmodel checked with racking and docks
2,500 Tfabrication capacity every month

What you need

Space that is ready for the peak season

Logistics, 3PL & e-commerce operators

Thai e-commerce and contract logistics keep growing, and every new contract needs space: a distribution centre near Bangkok, a fulfilment centre in the EEC, a cold chain hub for food.

You need a steel warehouse with the right clear height for your racking, column grids that do not block the aisles, enough docks and canopies for the rainy season, and a building that is ready before the next peak.

  • Clear spans and eave heights matched to the racking plan
  • Dock doors, canopies and levellers in the right places
  • A handover date that matches the client contract
  • Room to extend when volumes grow
  • Mezzanines for picking and offices

Your challenges, our answers

What logistics operators tell us, and how we answer

Challenge 01

The client contract starts on a fixed date

Our answer

Your fabrication slot is confirmed at order from 2,500 T of monthly capacity, and steel is shipped in erection sequence.

Challenge 02

Columns get in the way of the racking

Our answer

We set the column grid from your racking and aisle layout, with clear spans where you need them.

Challenge 03

Heavy rain at the docks

Our answer

Deep loading canopies and roof drainage designed for Thai monsoon rain.

Challenge 04

Volumes grow faster than planned

Our answer

End walls designed for extension, so new bays can be added later without stopping operations.

Challenge 05

Picking needs more floor area

Our answer

Steel mezzanines and pick platforms designed with the building, sized for your conveyors.

Challenge 06

Fire rules for high-bay storage

Our answer

Fire protection up to R120 applied in the factory where the insurer or authority requires it.

How we work with you

How a warehouse project runs with World Steel

We design, make and ship the steel; your Thai contractor builds.

  1. 1

    Send the operation brief

    Floor area, racking plan, docks and target opening date.

  2. 2

    Concept, budget & 3D model

    Column grid, tonnage and price, with a model of the warehouse.

  3. 3

    Approval drawings

    Calculations and drawings for your Thai engineer and the permit.

  4. 4

    Fabrication you can inspect

    Made in our factory. Visit, send an inspector or audit online.

  5. 5

    Delivery by erection zone

    CIF or DDP, packed so your crew can start on arrival.

Designed and made in our own factory

Every piece passes through World Steel hands

We are not a broker or a steel trader. Our engineers design it, and our factory in Tay Ninh makes, inspects and ships every piece.

World Steel factory · Tay Ninh, Vietnam20,000 m² · 2,500 T/month · 100 T in 3–4 weeksISO 9001 · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3 · IAS AC472
  1. Designed by our own engineers01

    Designed by our own engineers

    World Steel structural engineers calculate to Thai and international codes and produce the Tekla 3D model, approval drawings and every shop drawing. Nothing is outsourced.

  2. CNC cutting and drilling02

    CNC cutting and drilling

    Plates and sections cut by plasma, laser and CNC drilling lines straight from the model, with first-piece inspection before the batch runs.

  3. Built-up members welded in-house03

    Built-up members welded in-house

    Submerged-arc welding lines and qualified welders make columns and rafters to ISO 3834-2 and EN 1090 EXC3.

  4. Inspected before it leaves04

    Inspected before it leaves

    Dimensional checks, UT and MT weld testing and paint thickness readings, recorded piece by piece in the QC dossier you receive.

  5. Blasted and painted in the factory05

    Blasted and painted in the factory

    Shot blasting and an ISO 12944 paint system chosen for inland, coastal or port sites, or intumescent fire protection up to R120.

  6. Packed by erection zone, shipped CIF06

    Packed by erection zone, shipped CIF

    Every piece marked, bundled by erection zone and loaded so the first members your erector needs reach site first.

Who does what

We are the manufacturer and supplier. We do not compete with Thai contractors.

World Steel delivers the steel structure. Your Thai team does the foundations, erection and every other construction trade.

World Steel designs, makes and ships

  • Structural design, 3D model and shop drawings
  • Fabrication, inspection and painting in our factory
  • C/Z purlins, bolts and every accessory in the kit
  • CIF to a Thai port, or DDP to your site
  • Erection manual and site advisor on request

Your Thai team on site

  • Foundations, slabs and civil works
  • Erection of the steel frame
  • Roofing, walls and architectural finishes
  • MEP, electrical and plumbing
  • Permits and sign-off by your Thai engineer

Why World Steel

One partner from brief to Thai port

01

Exporting to Thailand since 2018

Factories, warehouses and commercial buildings delivered across Thailand.

02

Our own certified factory

2,500 T of fabrication capacity a month, ISO 9001 quality and ISO 3834-2 welding, inspected before shipment.

03

Thai-code engineering

Approval drawings your Thai engineer can sign, with wind and seismic loads for your province.

04

CIF or DDP to your site

Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.

FAQ

Questions Thai clients ask us

What clear span can a steel warehouse have?

Clear spans of 30 to 60 m are typical for distribution centres, and wider spans are possible. We set the span from your racking and aisle layout.

Can the warehouse be extended later?

Yes. We design an end wall that can be removed and new bays added without stopping operations.

Do you supply the cladding and doors?

We supply the steel structure, purlins and girts. Roofing, cladding and doors are supplied by your Thai contractor.

Do you deliver to sites outside an estate?

Yes. We deliver DDP to any site in Thailand and prepare drawings for the local building permit.

Need a new distribution centre?

Send the floor area, racking plan and target opening date. We reply within one working day with a structural concept and budget.

LINEWhatsAppGet a quotation