สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Steel buildings that start earning sooner

Customers · Investors & property developers

Steel buildings that start earning sooner

Warehouses for lease, car parks, showrooms and mixed-use buildings with a fixed steel price and a delivery date you can put in the tenant contract. Designed by our engineers, made in our own factory and shipped CIF or DDP to your Thai site.

2018exporting steel structures to Thailand
Fixedsteel price in the contract
3Dmodel to share with investors and tenants
2,500 Tfabrication capacity every month

What you need

A building that is on budget, on time and easy to lease

Investors & property developers

For an investor or developer, every month of construction is a month without rent. The steel frame is usually the largest single cost of a warehouse, car park or commercial building, and the one that sets the programme.

You need a supplier that fixes the price early, designs the structure for the tenants you want to attract and delivers on a date you can promise. And you want a building that will still lease well in twenty years.

  • A firm steel price before you commit to the project
  • A handover date you can put in the lease
  • Wide, column-free space that suits many tenants
  • Repeatable designs for several phases or sites
  • Durable paint and roof systems for the Thai climate

Your challenges, our answers

What developers tell us, and how we answer

Challenge 01

Steel prices move between budget and order

Our answer

We quote a fixed price for the agreed scope and hold it for the validity of the quotation, so the business case stays valid.

Challenge 02

Tenants want to move in on a fixed date

Our answer

Your fabrication slot is booked at order from 2,500 T of monthly capacity, and the steel arrives in erection sequence.

Challenge 03

We do not know the future tenant yet

Our answer

We design flexible spans, eave heights and floor loads that suit several uses, with provision for mezzanines or cranes later.

Challenge 04

The banks and investors want clear numbers

Our answer

Tonnage, price, scope and schedule on one page, plus a 3D model you can show to investors and tenants.

Challenge 05

We build in phases over several years

Our answer

One standard design reused phase after phase, with the same details, the same quality and a known cost per square metre.

Challenge 06

Insurers and authorities ask for fire safety

Our answer

Fire protection up to R120 applied in our factory, documented for the permit and the insurer.

How we work with you

How a development project runs with World Steel

We deliver the steel; your Thai contractor builds the project.

  1. 1

    Share the concept

    Site, building size, intended use and target handover date.

  2. 2

    Budget & concept design

    Tonnage, price and a structural concept for your business case.

  3. 3

    Approval drawings

    Calculations and drawings for your Thai engineer and the building permit.

  4. 4

    Fabrication you can inspect

    Made in our factory. Visit, send an inspector or audit online.

  5. 5

    Delivery to the programme

    CIF or DDP, packed in erection sequence for your contractor.

Designed and made in our own factory

Every piece passes through World Steel hands

We are not a broker or a steel trader. Our engineers design it, and our factory in Tay Ninh makes, inspects and ships every piece.

World Steel factory · Tay Ninh, Vietnam20,000 m² · 2,500 T/month · 100 T in 3–4 weeksISO 9001 · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3 · IAS AC472
  1. Designed by our own engineers01

    Designed by our own engineers

    World Steel structural engineers calculate to Thai and international codes and produce the Tekla 3D model, approval drawings and every shop drawing. Nothing is outsourced.

  2. CNC cutting and drilling02

    CNC cutting and drilling

    Plates and sections cut by plasma, laser and CNC drilling lines straight from the model, with first-piece inspection before the batch runs.

  3. Built-up members welded in-house03

    Built-up members welded in-house

    Submerged-arc welding lines and qualified welders make columns and rafters to ISO 3834-2 and EN 1090 EXC3.

  4. Inspected before it leaves04

    Inspected before it leaves

    Dimensional checks, UT and MT weld testing and paint thickness readings, recorded piece by piece in the QC dossier you receive.

  5. Blasted and painted in the factory05

    Blasted and painted in the factory

    Shot blasting and an ISO 12944 paint system chosen for inland, coastal or port sites, or intumescent fire protection up to R120.

  6. Packed by erection zone, shipped CIF06

    Packed by erection zone, shipped CIF

    Every piece marked, bundled by erection zone and loaded so the first members your erector needs reach site first.

Who does what

We are the manufacturer and supplier. We do not compete with Thai contractors.

World Steel delivers the steel structure. Your Thai team does the foundations, erection and every other construction trade.

World Steel designs, makes and ships

  • Structural design, 3D model and shop drawings
  • Fabrication, inspection and painting in our factory
  • C/Z purlins, bolts and every accessory in the kit
  • CIF to a Thai port, or DDP to your site
  • Erection manual and site advisor on request

Your Thai team on site

  • Foundations, slabs and civil works
  • Erection of the steel frame
  • Roofing, walls and architectural finishes
  • MEP, electrical and plumbing
  • Permits and sign-off by your Thai engineer

Why World Steel

One partner from brief to Thai port

01

Exporting to Thailand since 2018

Factories, warehouses and commercial buildings delivered across Thailand.

02

Our own certified factory

2,500 T of fabrication capacity a month, ISO 9001 quality and ISO 3834-2 welding, inspected before shipment.

03

Thai-code engineering

Approval drawings your Thai engineer can sign, with wind and seismic loads for your province.

04

CIF or DDP to your site

Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.

FAQ

Questions Thai clients ask us

Can you price a project before we buy the land?

Yes. With the building size and use we give a budget price and a structural concept, so you can test the business case early.

Do you build the project?

No. We are the manufacturer and supplier of the steel structure. Your Thai contractor builds it, and we support them with drawings, an erection manual and a site advisor on request.

Can the same design be used for several phases?

Yes. We keep one standard design and update it for each phase, so cost and quality stay the same.

Can the building take a mezzanine or crane later?

Yes, if we know now. We design the frame with the provision, so it can be added without strengthening.

Planning a building to lease or sell?

Send the site, size and intended use. We reply within one working day with a structural concept and a steel budget.

LINEWhatsAppGet a quotation