สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
Steel buildings for schools, hospitals and communities, built during the break

Customers · Schools, hospitals & communities

Steel buildings for schools, hospitals and communities, built during the break

Classroom blocks, sports halls, covered courts, hospital car parks, covered walkways and community halls. We design and fabricate the steel structure in our own factory and deliver it ready to bolt, so your Thai contractor finishes on site in weeks, not months.

2018exporting steel structures to Thailand
Weekson site instead of months
R120fire protection for public buildings
2,500 Tfabrication capacity every month

What you need

Safe buildings, finished while the students are away

Schools, hospitals & communities

Schools and hospitals cannot stop. A new classroom block, sports hall, covered court or hospital car park has to be built in a short window, close to students, patients and visitors, and it must be safe for decades.

Prefabricated steel moves most of the work into our factory. We design and fabricate the structure, and the Thai contractor erects it with bolts in a few weeks, with less noise, dust and traffic on site.

  • Short, quiet work on site during school breaks
  • Column-free halls and covered courts
  • Multi-storey blocks and car parks on small plots
  • Fire protection and long-life paint
  • Supply through your Thai contractor

Your challenges, our answers

What schools, hospitals and communities need, and how we answer

Challenge 01

Work must fit a school break

Our answer

Steel is made while the old building is still in use, then erected in weeks.

Challenge 02

Students and patients are close by

Our answer

Bolted connections mean little welding, noise or dust on site.

Challenge 03

Plots are small and crowded

Our answer

Multi-storey steel frames and car parks use the land more efficiently than wide low buildings.

Challenge 04

Budgets come from donors or public funds

Our answer

A clear steel price and tonnage that the contractor can quote with confidence.

Challenge 05

Public buildings need fire safety

Our answer

Intumescent fire protection up to R120 applied and recorded in our factory.

Challenge 06

The building must last

Our answer

Paint systems chosen for the Thai climate and designed to Thai codes.

How we work with you

How a school or hospital project runs

Planned around your calendar, built by your Thai contractor.

  1. 1

    Brief & calendar

    Building size, use and the window available on site.

  2. 2

    Steel price

    Tonnage, price and schedule for the contractor.

  3. 3

    Design & approval drawings

    Calculations to Thai codes for the licensed engineer.

  4. 4

    Fabrication in our factory

    Made before the break, open to inspection and online audit.

  5. 5

    Delivery & fast erection

    Steel in erection sequence, bolted up in weeks.

Designed and made in our own factory

Every piece passes through World Steel hands

We are not a broker or a steel trader. Our engineers design it, and our factory in Tay Ninh makes, inspects and ships every piece.

World Steel factory · Tay Ninh, Vietnam20,000 m² · 2,500 T/month · 100 T in 3–4 weeksISO 9001 · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3 · IAS AC472
  1. Designed by our own engineers01

    Designed by our own engineers

    World Steel structural engineers calculate to Thai and international codes and produce the Tekla 3D model, approval drawings and every shop drawing. Nothing is outsourced.

  2. CNC cutting and drilling02

    CNC cutting and drilling

    Plates and sections cut by plasma, laser and CNC drilling lines straight from the model, with first-piece inspection before the batch runs.

  3. Built-up members welded in-house03

    Built-up members welded in-house

    Submerged-arc welding lines and qualified welders make columns and rafters to ISO 3834-2 and EN 1090 EXC3.

  4. Inspected before it leaves04

    Inspected before it leaves

    Dimensional checks, UT and MT weld testing and paint thickness readings, recorded piece by piece in the QC dossier you receive.

  5. Blasted and painted in the factory05

    Blasted and painted in the factory

    Shot blasting and an ISO 12944 paint system chosen for inland, coastal or port sites, or intumescent fire protection up to R120.

  6. Packed by erection zone, shipped CIF06

    Packed by erection zone, shipped CIF

    Every piece marked, bundled by erection zone and loaded so the first members your erector needs reach site first.

Who does what

We are the manufacturer and supplier. We do not compete with Thai contractors.

World Steel delivers the steel structure. Your Thai team does the foundations, erection and every other construction trade.

World Steel designs, makes and ships

  • Structural design, 3D model and shop drawings
  • Fabrication, inspection and painting in our factory
  • C/Z purlins, bolts and every accessory in the kit
  • CIF to a Thai port, or DDP to your site
  • Erection manual and site advisor on request

Your Thai team on site

  • Foundations, slabs and civil works
  • Erection of the steel frame
  • Roofing, walls and architectural finishes
  • MEP, electrical and plumbing
  • Permits and sign-off by your Thai engineer

Proven projects

Community and public-use projects we have delivered

Markets, car parks and buildings in Thailand designed and fabricated by World Steel.

All Thai projects

Why World Steel

One partner from brief to Thai port

01

Exporting to Thailand since 2018

Factories, warehouses and commercial buildings delivered across Thailand.

02

Our own certified factory

2,500 T of fabrication capacity a month, ISO 9001 quality and ISO 3834-2 welding, inspected before shipment.

03

Thai-code engineering

Approval drawings your Thai engineer can sign, with wind and seismic loads for your province.

04

CIF or DDP to your site

Shipped to Laem Chabang, Bangkok, Map Ta Phut or Songkhla, with documents for your customs broker.

FAQ

Questions Thai clients ask us

Can the building be finished during a school break?

Often yes. The steel is fabricated before the break and the structure is bolted up on site in a few weeks. The exact time depends on size and site access.

Do you build the school or hospital?

No. We design, fabricate and supply the steel structure and purlins. A Thai contractor builds the project, including foundations, roofing and finishes.

Is steel safe for public buildings?

Yes. Structures are designed to Thai building, wind and seismic codes, and fire protection up to R120 can be applied in our factory.

Can a temple or foundation order a hall?

Yes, through a Thai contractor of your choice. We give the contractor a clear steel price.

Planning a school, hospital or community building?

Send the size and your calendar. We reply within one working day with a steel price for your contractor.

LINEWhatsAppGet a quotation