สวัสดีWelcome to World Steel Thailand – structural steel, purlins and fire protection for the Kingdom +84 902 881 833 LINE / WhatsApp victor@worldsteelgroup.com IAS AC472 · ISO 3834-2 World Steel Group ↗
Thailand
CMA CGM, CNC and APL between Vietnam and Thailand

Shipping lines · Vietnam → Thailand

CMA CGM, CNC and APL between Vietnam and Thailand

The CMA CGM group runs several Asia services that call at Vietnamese ports and at Laem Chabang and Bangkok. Here is what each one offers for steel structures shipped from Vietnam to your site in Thailand.

4services calling at both countries in the July 2026 booklet
5 daysChu Lai → Laem Chabang (CNC JTVS)
≈ 8 daysHai Phong → Laem Chabang / Bangkok (APL RBH)
2Thai ports: Laem Chabang and Bangkok

About the line

A global carrier with two intra-Asia brands

CMA CGM is a container shipping group based in Marseille, France. In Asia it sells many regional services under two group brands: CNC, focused on intra-Asia trades, and APL.

Between Vietnam and Thailand the group’s services are mostly long loops that link Japan, Korea, China and Southeast Asia. Some call at Vietnam first and then Thailand, which suits cargo from Hai Phong or central Vietnam. Others call at Thailand first and Vietnam after, which suits the return direction.

For steel structures from our factory near Ho Chi Minh City we usually take a direct southern service with a shorter transit (see the transit table). We name the line, vessel and sailing in your quotation.

Indicative transit times

From Vietnamese ports to Thai ports

  1. VNHai Phong5–8 daysindicativeTHLaem Chabang Port
  2. VNHai PhongAbout 8 daysindicativeTHBangkok Port (Khlong Toei)
  3. VNChu Lai (Quang Nam)5 daysindicativeTHLaem Chabang Port

Vietnam → Thailand services

CMA CGM services calling at Vietnam and Thailand

As published by the line. Transit times are indicative; the actual vessel, sailing and transit time are confirmed in every quotation.

ServiceRotation (port order)Vietnam → ThailandSource
CNC JTVSTokyo › Yokohama › Nagoya › Kobe › Busan › Gwangyang › Kaohsiung › Chu Lai › Laem Chabang › Ho Chi Minh City › TokyoChu Lai → Laem Chabang 5 daysBooklet 9 Jul 2026 (service update 2 Jun 2026)
APL RBHShekou › Nansha › Laem Chabang › Bangkok › Laem Chabang › Hai Phong › ShekouHai Phong → Laem Chabang / Bangkok about 8 days, via Shekou and Nansha (from port days)Booklet 9 Jul 2026 (service update 13 Sep 2024)
CNC CT8Shanghai › Ningbo › Laem Chabang › Hai Phong › Yangpu › ShanghaiThailand first: Laem Chabang → Hai Phong 5 days. Hai Phong → Laem Chabang goes round the loop (about 16 days)Booklet 9 Jul 2026 (service update 23 Apr 2026)
CNC NKTIncheon › Gwangyang › Busan › Hong Kong › Shekou › Laem Chabang › Bangkok › Laem Chabang › Ho Chi Minh City › IncheonThailand first: Laem Chabang → Ho Chi Minh City 2 daysBooklet 9 Jul 2026 (service update 11 Dec 2024)
  • Vietnamese port
  • Thai port

Source: CMA CGM “Service Details” booklet, 9 July 2026. Transit days are indicative and can change with each schedule; we confirm the actual sailing in your quotation.

From our factory to your site

How your steel structure travels

The sea leg is one part of the trip. We plan the whole route from our factory to your plot.

  1. 1

    Fabricated and inspected

    Made in our own factory in Tay Ninh, every piece checked against the ITP before packing.

  2. 2

    Packed by erection zone

    Bundled and tagged in erection sequence; long members go in flat-rack or open-top containers.

  3. 3

    The sailing that fits your programme

    We pick a direct service that matches your foundation schedule and name the vessel and sailing date in the quotation.

  4. 4

    Documents before arrival

    B/L, packing list, invoice and Form D (ATIGA) reach your customs broker before the vessel berths.

  5. 5

    Delivered to site

    CIF to the Thai port, or DDP with clearance, duty and trucking to your site.

Steel structure by sea

What we settle when shipping structural steel

Issue 01

Members longer than a container

How we handle it

Flat-rack or open-top containers, or bolted splices designed so members fit standard 40 ft boxes when that is cheaper.

Issue 02

Free time at the port

How we handle it

Shipments go out by erection zone, timed to your foundations, so containers leave the terminal straight away.

Issue 03

Duty preference and documents

How we handle it

Every shipment carries a Form D for the ATIGA tariff, with invoice, packing list and HS codes that match line by line.

Issue 04

Salt air near the coast

How we handle it

Sites close to the sea get a paint system for a higher corrosion category, from our paint systems range.

FAQ

Questions Thai clients ask us

Does CMA CGM sail direct from Ho Chi Minh City to Thailand?

In the July 2026 booklet the group’s services from Ho Chi Minh City reach Thailand only after a long loop; the direct calls go from Thailand to Ho Chi Minh City. For cargo from the south we usually use another line’s direct service, with a transit of about 1–2 days to Laem Chabang.

How long from Hai Phong to Laem Chabang with CMA CGM?

About 8 days on the APL RBH service, which calls at Shekou and Nansha on the way. MSC’s Saola service is faster at about 5 days. We compare both in the quotation.

Can long rafters and columns go on these services?

Yes. Members up to about 12 m fit a 40 ft container; longer members go in flat-rack or open-top containers when the line has space, or we design bolted splices.

Do you choose the shipping line, or can we?

Under CIF we book the line and sailing that best fits your programme. If you prefer a specific line, tell us and we quote on that line.

Other lines

Other shipping lines between Vietnam and Thailand

All shipping lines

Line names are trademarks of their owners. World Steel is not an agent of any shipping line. Data from published schedules and subject to change.

Planning to ship a steel building to Thailand?

Send us your site location and building size. We reply with a concept design, a CIF price to the nearest Thai port and a sailing that fits your programme.

LINEWhatsAppGet a quotation