Members longer than a container
Flat-rack or open-top containers, or bolted splices designed so members fit standard 40 ft boxes when that is cheaper.

Shipping lines · Vietnam → Thailand
The SVT service, started in December 2025, calls at Cat Lai and then at Bangkok Port and Laem Chabang, a useful option for sites in Bangkok and the central plains.
About the line
TS Lines is a container line based in Taipei, Taiwan. Its SVT service started in December 2025 on a 14-day rotation from South China to Ho Chi Minh City (Cat Lai), then Bangkok Port (PAT) and Laem Chabang.
The Bangkok call matters for steel bound for Bangkok, Samut Prakan and the central plains: containers can be discharged at the river port close to the site. TS Lines did not publish transit days for these legs in its announcement; on other lines Ho Chi Minh City → Bangkok takes about 2–4 days.
We name the line, vessel and sailing in your quotation.
Indicative transit times
Vietnam → Thailand services
As published by the line. Transit times are indicative; the actual vessel, sailing and transit time are confirmed in every quotation.
| Service | Rotation (port order) | Vietnam → Thailand | Source |
|---|---|---|---|
| SVT | Nansha › Shekou › Ho Chi Minh City (Cat Lai) › Bangkok (PAT) › Laem Chabang › Nansha | Direct calls Ho Chi Minh City → Bangkok → Laem Chabang; transit not published | India Seatrade News, Nov 2025 |
Source: TS Lines SVT announcement as reported by India Seatrade News (November 2025). We confirm the actual sailing and transit in your quotation.
Thai ports called
See the industrial estates around each port and how we deliver your steel structure to site.
CIFThe river port in central Bangkok – our CIF port for Bangkok and Samut Prakan sites in standard containers.
Explore the port
CIFThailand’s main deep-sea container port in Chonburi, gateway to the EEC estates – our default CIF port.
Explore the portFrom our factory to your site
The sea leg is one part of the trip. We plan the whole route from our factory to your plot.
Made in our own factory in Tay Ninh, every piece checked against the ITP before packing.
Bundled and tagged in erection sequence; long members go in flat-rack or open-top containers.
We pick a direct service that matches your foundation schedule and name the vessel and sailing date in the quotation.
B/L, packing list, invoice and Form D (ATIGA) reach your customs broker before the vessel berths.
CIF to the Thai port, or DDP with clearance, duty and trucking to your site.
Steel structure by sea
Flat-rack or open-top containers, or bolted splices designed so members fit standard 40 ft boxes when that is cheaper.
Shipments go out by erection zone, timed to your foundations, so containers leave the terminal straight away.
Every shipment carries a Form D for the ATIGA tariff, with invoice, packing list and HS codes that match line by line.
Sites close to the sea get a paint system for a higher corrosion category, from our paint systems range.
Related topics
FAQ
For sites in Bangkok, Samut Prakan and the central plains, Bangkok Port is closer, so the truck leg is shorter. Bangkok Port has draft and vessel-size limits, which is why fewer services call there.
TS Lines has not published the transit for this leg. Lines with published schedules take about 2–4 days on the same leg; we confirm the actual sailing in the quotation.
Under CIF we book the line and sailing that best fits your programme. If you prefer a specific line, tell us and we quote on that line.
Other lines
Line names are trademarks of their owners. World Steel is not an agent of any shipping line. Data from published schedules and subject to change.
Send us your site location and building size. We reply with a concept design, a CIF price to the nearest Thai port and a sailing that fits your programme.