Members longer than a container
Flat-rack or open-top containers, or bolted splices designed so members fit standard 40 ft boxes when that is cheaper.

Shipping lines · Vietnam → Thailand
SM Line’s CPX service sails from Cat Lai to Bangkok and Laem Chabang, with the Thai terminals named in its schedule.
About the line
SM Line is a container line based in Seoul, Korea. Its CPX (China Pacific Express) service calls at Gwangyang, Busan and Shanghai, then Ho Chi Minh City (Cat Lai terminal), Bangkok (Unithai terminal) and Laem Chabang (LCIT terminal).
The published weekday schedule has the vessel leaving Ho Chi Minh City on Thursday and reaching Bangkok on Sunday, about 3 days. The line’s own transit table shows other figures, so we treat 3 days as indicative and confirm the sailing in your quotation.
The Bangkok call suits sites in Bangkok and the central plains; Laem Chabang serves the Eastern Seaboard estates.
Indicative transit times
Vietnam → Thailand services
As published by the line. Transit times are indicative; the actual vessel, sailing and transit time are confirmed in every quotation.
| Service | Rotation (port order) | Vietnam → Thailand | Source |
|---|---|---|---|
| CPX | Gwangyang › Busan › Shanghai › Ho Chi Minh City (Cat Lai) › Bangkok (Unithai) › Laem Chabang (LCIT) | Ho Chi Minh City (Thu) → Bangkok (Sun): about 3 days | SM Line service page |
Source: SM Line CPX service page (rotation, terminals and weekdays). The days are computed from the weekdays and are indicative; we confirm the actual sailing in your quotation.
Thai ports called
See the industrial estates around each port and how we deliver your steel structure to site.
CIFThe river port in central Bangkok – our CIF port for Bangkok and Samut Prakan sites in standard containers.
Explore the port
CIFThailand’s main deep-sea container port in Chonburi, gateway to the EEC estates – our default CIF port.
Explore the portFrom our factory to your site
The sea leg is one part of the trip. We plan the whole route from our factory to your plot.
Made in our own factory in Tay Ninh, every piece checked against the ITP before packing.
Bundled and tagged in erection sequence; long members go in flat-rack or open-top containers.
We pick a direct service that matches your foundation schedule and name the vessel and sailing date in the quotation.
B/L, packing list, invoice and Form D (ATIGA) reach your customs broker before the vessel berths.
CIF to the Thai port, or DDP with clearance, duty and trucking to your site.
Steel structure by sea
Flat-rack or open-top containers, or bolted splices designed so members fit standard 40 ft boxes when that is cheaper.
Shipments go out by erection zone, timed to your foundations, so containers leave the terminal straight away.
Every shipment carries a Form D for the ATIGA tariff, with invoice, packing list and HS codes that match line by line.
Sites close to the sea get a paint system for a higher corrosion category, from our paint systems range.
Related topics
FAQ
About 3 days, based on the weekdays in the CPX schedule. We confirm the actual sailing in the quotation.
Unithai in Bangkok and LCIT in Laem Chabang, as named in the CPX schedule.
Under CIF we book the line and sailing that best fits your programme. If you prefer a specific line, tell us and we quote on that line.
Other lines
Line names are trademarks of their owners. World Steel is not an agent of any shipping line. Data from published schedules and subject to change.
Send us your site location and building size. We reply with a concept design, a CIF price to the nearest Thai port and a sailing that fits your programme.